Gotthard Traffic – Easter
📆 Good Friday – Easter Monday (variable)
Complete guides, practical tips and facts about the Gotthard Tunnel
A technical page with build progress, days left, milestones, and official UVEK / gotthardtunnel.ch sources.
Forecasts and tips for the busiest times at the Gotthard
📆 Good Friday – Easter Monday (variable)
📆 39th day after Easter, Thursday (variable)
📆 Sunday 50th day after Easter + Whit Monday (variable)
📆 June – August, every weekend
📆 Year-round (usually 21:00–05:00)
📆 Open since 8 May 2026 — Expected closure: November
📆 🟢 Open since 13 May 2026 when signposted
Berchtold’s Day 2027: a Swiss winter travel checklist. Check holiday dates, regional differences, bridge days and outward and return travel.
New Year 2027: planning your Gotthard crossing. Check holiday dates, regional differences, bridge days and outward and return travel.
Plan 2027 Gotthard journeys around Swiss, German, Italian, Dutch and French holidays, with regional exceptions and practical guides.
A Gotthard driving update: the winter pass closure, useful road-tunnel checks and progress on the second tube.
Gotthard Pass closing date: research status for autumn 2026, official road information and the difference between the pass and road tunnel.
Simplon or Gotthard for Milan and northern Italy: when the route via Brig and Domodossola is genuinely worth the detour.
San Bernardino, Simplon and the Gotthard Pass compared: when each Gotthard alternative is worth using.