ITDEFREN
← Home

Gotthard Traffic – Peak Periods

Forecasts, alternatives and tips for the busiest times

EVENTLIVE

Gotthard Traffic – Easter

Easter is one of the busiest periods at the Gotthard. Friday departures and Sunday returns cause queues exceeding 10 km.

Period: 2026-04-03 – 2026-04-06

Read the guide →
EVENTLIVE

Gotthard Traffic – Ascension Day

The Ascension long weekend (Thursday holiday + Friday bridge day) creates heavy traffic towards Ticino and Italy.

Period: 2026-05-14 – 2026-05-17

Read the guide →
EVENTLIVE

Gotthard Traffic – Pentecost

The Pentecost weekend (50 days after Easter) is traditionally one of the busiest of the year heading south, with already summer-like temperatures in Ticino.

Period: 2026-05-23 – 2026-05-25

Read the guide →
EVENTLIVE

Gotthard Traffic – Summer Weekends

From June to August, every weekend brings significant queues at the Gotthard. Saturday morning is the critical time for travel towards Italy.

Period: June – August, every weekend

Read the guide →
EVENTLIVE

Gotthard Traffic – 1 August 2026 (National Day)

August 1st 2026 falls on a Saturday, creating a double peak: National Day traffic plus normal summer weekend. Queues can reach 12 km. The Gotthard Pass is open.

Period: 2026-07-31 – 2026-08-02

Read the guide →
EVENTLIVE

Gotthard Traffic – Ferragosto (15 August)

Ferragosto (15 August) is the main Italian summer holiday. Italian motorways are jammed and the return wave of Italians from Switzerland reaches the Gotthard.

Period: 2026-08-14 – 2026-08-17

Read the guide →
EVENTLIVE

Gotthard Night Closures

The Gotthard tunnel is regularly closed at night for maintenance works. Closures generally occur between 21:00 and 05:00.

Period: Year-round (usually 21:00–05:00)

Read the guide →
EVENTLIVE

Gotthard Pass Opening 2026

The Gotthard Pass (altitude 2106 m) generally opens between late May and early June. The opening depends on snow conditions and FEDRO clearing operations.

Period: Opening: late May / early June — Closure: November

Read the guide →
EVENTLIVE

A2 Airolo – CUPRA Preferential Lane (Construction)

ASTRA construction project on the A2 between the Varenzo junction and the Airolo exit (~9 km). CUPRA creates a preferential bypass lane around the Stalvedro service area for northbound traffic. Expected opening summer 2026.

Period: 2025-01-01 – 2026-11-30

Read the guide →
📅
This Weekend at the Gotthard
Traffic forecast for Saturday and Sunday
📊
Gotthard Monthly Statistics
Monthly statistics →