The Gotthard Pass (2106 m) officially reopened to traffic on Friday, 8 May 2026 at 11:00 after the winter closure. TCS currently lists the pass as open, with snow on the pass road.
Recommended route
The pass is open and is the scenic alternative when weather and road conditions allow; for more predictable travel time, stay with the A2 tunnel.
N → S (Göschenen): 0 km · S → N (Airolo): 0 km · Tunnel: open
N → S (Göschenen)
S → N (Airolo)
Tunnel
openPass
openThe pass has officially been open since 8 May 2026 at 11:00; always check the live status and road conditions before driving.
View the real-time situation at the north and south portals
Preview webcams load on view without background polling.
Worst hours
10:00–14:00
Depart before
08:00
or after
15:00
After opening, the pass attracts motorcyclists and tourists, especially in good weather. FEDRO expects the pass to ease pressure on the A2 corridor during Ascension and Pentecost.
Worst hours
09:00–17:00
Expected queue
~3 km
With the pass open, some tourist traffic can avoid the tunnel. Queues on the pass road are usually local and short, but remaining snow and alpine weather call for caution.
The 2025/26 winter closure has been lifted. The next seasonal closure is usually expected in November, depending on the first heavy snowfalls.
The open pass can ease pressure on the A2 tunnel. At the north portal, the seasonal extended Göschenen exit is in operation; since 13 May 2026, the Airolo/Passes CUPRA lane is available when activated by VMZ.
Pass open and CUPRA lane active
Follow signs for Airolo/Passes and use the dedicated lane only when the panels show it as open